Bescot Point, Walsall

Industrial Refurbishment

Property Manager: Our client wished to refurbish these two vacant industrial units to prepare for new clients to move in. Their eight month timeframe would allow for an extensive schedule of works of both internal and external refurbishment.

Client: Our client wished to refurbish these two vacant industrial units to prepare for new clients to move in. Their eight month timeframe would allow for an extensive schedule of works of both internal and external refurbishment.

Service: Industrial Refurbishment

Our client wished to refurbish these two vacant industrial units to prepare for new clients to move in. Their eight month timeframe would allow for an extensive schedule of works of both internal and external refurbishment.

Our works consisted of:

External

  • Over cladding of existing vertical cladding
  • Car park resurfacing
  • Roof repairs
  • Installation of 3no new Roller shutter doors
  • Installation of new PPC Steel Security doors

Internal

  • Asbestos removal
  • Full electrical upgrade and LED lighting upgrade throughout
  • Fire alarm upgrade
  • Full internal decoration throughout
  • New Carpet, Luxury vinyl tile and Polyflor installation
  • Warehouse floor painting
  • New suspended ceilings
  • Washroom and toilet facilities upgrade
  • Installation of new kitchens
The final space was to the client’s requested specification, both units were finished to a high standard, ready for new tenants to begin renting.

Featured Projects

orangebar

What Our Clients Say

orangebar

Romsley Point, Farley Lane, Romsley, Bromsgrove, B62 0LG
[email protected]       |      0330 113 4500

 Registered Company No. 09012851    |    Copyright @ 2022 Calztec